Connect with us

Society

Domestic health declaration for COVID-19 prevention and control no longer required across Việt Nam

Published

on

 

A customer holds up a QR code linked to their COVID-19 health declaration form for checks. — VNA/ Photo Huy Hùng

HÀ NỘI — The Vietnamese health ministry has on Thursday sent a document to municipal/provincial people’s committees on the temporary suspension of domestic heath declaration requirements, which have been in place since the start of the COVID-19 pandemic.

The self-filled declaration form contains basic personal information, travel history over the past 14 days, potential exposure to people with suspected COVID-19 symptoms and COVID-19 vaccination status.

The temporary abolishment of this requirement is the latest move in Việt Nam’s attempt to live with the virus.

According to the health ministry, COVID-19 has been put well under control across the country, with caseload and fatalities down significantly – the average number of deaths reported daily has stayed below 10 for several weeks now, while 96 per cent of the population aged 12 and older have been fully vaccinated against COVID-19, with the inoculation of children aged five to 11 underway.

It is noted that the current COVID-19 vaccines are still effective against known strains of coronavirus.

The Ministry of Health requested local administrations to suspend the application of domestic health declarations – required for domestic travel, entry to public places such as restaurants, etc. – from April 30, 2022. This is based on the current situation, Việt Nam’s response capacity to COVID-19 and the Government’s Resolution No.38/NQ-CP dated March 17, 2022 promulgating the programme on COVID-19 prevention and control with the strategy of “ensuring safe, flexible adaptation and effective control of the COVID-19 epidemic; prevention and control measures implemented according to risk mitigation methods; and maintaining the balance between the COVID-19 prevention and control measures with the measures aimed at socio-economic recovery”.

Local administrations should continue to keep-up surveillance efforts to early detect and response to possible flare-ups of COVID-19, in the service of public health.

Localities have also been told to actively update communication materials and recommendations on COVID-19 prevention and control in accordance with the current situation, and disseminate this information to the public.

Previously, the Ministry of Health had sent an urgent document to the People’s Committees of the provinces and cities on the suspension of COVID-19 medical declaration for COVID-19 at all border gates of Việt Nam for all entrants into the country from April 27, 2022, after reports of long lines and waiting time caused by the inspection of the self-filled medical forms.

With the suspension of health declaration, along with the previous lifting of restrictions on large gatherings, the mandate on mask-wearing in public places, as well as disinfection, remain the only COVID-19-related public health measures in effect in Việt Nam. —

Source: https://vietnamnews.vn/society/1188772/domestic-health-declaration-for-covid-19-prevention-and-control-no-longer-required-across-viet-nam.html

Society

Vietnam’s Da Lat City overcrowded with vehicles of Tet goers

Published

on

All major streets in Vietnam’s tourist highland city of Da Lat were packed with vehicles on Thursday, the last day of the seven-day Tet break (2023 Lunar New Year) as so many personal cars and passenger vans traveled to the city.

The traffic jams were serious as so many vehicles entered the city center even though the number of visitors during this Tet was not too big compared to last year’s edition, as noted by Tien Phong (Youth) newspaper reporters.

Tran Manh Son, a visitor from Ho Chi Minh City, told Tien Phong that it took him nearly an hour to drive his family in his car for a distance of about three kilometers from a hotel on Trieu Viet Vuong Street to Tran Hung Dao Street.

“Cars and larger vehicles were overloaded everywhere, so many cars inched a bit, as slow as walking,” Son said.   

The area of Xuan Huong Lake was constantly congested from 8:30 am to 11:00 am, and the same situation was recorded in many other sites, including the city’s flower garden, the Ong Dao Bridge, the Da Lat market roundabout, and the intersection of Dinh Tien Hoang, Tran Quoc Toan, and Bui Thi Xuan Streets.

Police officers were deployed on many streets to regulate traffic and guide vehicles to change their directions to avoid entering the ways leading to traffic jam sites.

Vinh, the driver of a 50-seater long-haul bus, said he picked up passengers on Hoang Van Thu Street but could not drive them to Domaine Church on Ngo Quyen Street because of the serious congestion that had lasted for more than an hour.

He added his passengers wanted to change their destination to avoid the jam but he failed to turn the bus to any other directions to get out of the congested site.

“Now I can do nothing but wait for the congestion to ease,” Vinh said.

Nguyen Hung Minh, a long-haul bus driver, said he drove passengers to Da Lat on Tuesday and has since witnessed such traffic jams at the city’s gateways.

The Da Lat administration blamed the serious congestion on personal cars and long-haul buses that had come to this tourist destination, which is the capital city of Lam Dong Province in the Central Highlands region. 

Such traffic jams have partly affected the quality of tours to Da Lat, local authorities said.

A traffic police officer is seen asking a car driver to change his direction to avoid entering the ongoing congestion site in Da Lat. Photo: Mai Vinh / Tien Phong

A traffic police officer is seen asking a car driver to change his direction to avoid entering the ongoing congestion site in Da Lat. Photo: Mai Vinh / Tien Phong

This image shows many personal cars and long-haul buses in a traffic jam in Da Lat City on January 26, 2023. Photo: Mai Vinh / Tien Phong

This image shows many personal cars and long-haul buses in a traffic jam in Da Lat City on January 26, 2023. Photo: Mai Vinh / Tien Phong

Many young people are seen still joyful despite being stuck in traffic congestion on a street in Da Lat City on January 26, 2023. Photo: Mai Vinh / Tien Phong

Many young people are seen still joyful despite being stuck in traffic congestion on a street in Da Lat City on January 26, 2023. Photo: Mai Vinh / Tien Phong

Like us on Facebook or follow us on Twitter to get the latest news about Vietnam!

All major streets in Vietnam’s tourist highland city of Da Lat were packed with vehicles on Thursday, the last day of the seven-day Tet break (2023 Lunar New Year) as so many personal cars and passenger vans traveled to the city.

The traffic jams were serious as so many vehicles entered the city center even though the number of visitors during this Tet was not too big compared to last year’s edition, as noted by Tien Phong (Youth) newspaper reporters.

Tran Manh Son, a visitor from Ho Chi Minh City, told Tien Phong that it took him nearly an hour to drive his family in his car for a distance of about three kilometers from a hotel on Trieu Viet Vuong Street to Tran Hung Dao Street.

“Cars and larger vehicles were overloaded everywhere, so many cars inched a bit, as slow as walking,” Son said.   

The area of Xuan Huong Lake was constantly congested from 8:30 am to 11:00 am, and the same situation was recorded in many other sites, including the city’s flower garden, the Ong Dao Bridge, the Da Lat market roundabout, and the intersection of Dinh Tien Hoang, Tran Quoc Toan, and Bui Thi Xuan Streets.

Police officers were deployed on many streets to regulate traffic and guide vehicles to change their directions to avoid entering the ways leading to traffic jam sites.

Vinh, the driver of a 50-seater long-haul bus, said he picked up passengers on Hoang Van Thu Street but could not drive them to Domaine Church on Ngo Quyen Street because of the serious congestion that had lasted for more than an hour.

He added his passengers wanted to change their destination to avoid the jam but he failed to turn the bus to any other directions to get out of the congested site.

“Now I can do nothing but wait for the congestion to ease,” Vinh said.

Nguyen Hung Minh, a long-haul bus driver, said he drove passengers to Da Lat on Tuesday and has since witnessed such traffic jams at the city’s gateways.

The Da Lat administration blamed the serious congestion on personal cars and long-haul buses that had come to this tourist destination, which is the capital city of Lam Dong Province in the Central Highlands region. 

Such traffic jams have partly affected the quality of tours to Da Lat, local authorities said.

A traffic police officer is seen asking a car driver to change his direction to avoid entering the ongoing congestion site in Da Lat. Photo: Mai Vinh / Tien Phong

A traffic police officer is seen asking a car driver to change his direction to avoid entering the ongoing congestion site in Da Lat. Photo: Mai Vinh / Tien Phong

This image shows many personal cars and long-haul buses in a traffic jam in Da Lat City on January 26, 2023. Photo: Mai Vinh / Tien Phong

This image shows many personal cars and long-haul buses in a traffic jam in Da Lat City on January 26, 2023. Photo: Mai Vinh / Tien Phong

Many young people are seen still joyful despite being stuck in traffic congestion on a street in Da Lat City on January 26, 2023. Photo: Mai Vinh / Tien Phong

Many young people are seen still joyful despite being stuck in traffic congestion on a street in Da Lat City on January 26, 2023. Photo: Mai Vinh / Tien Phong

Like us on Facebook or follow us on Twitter to get the latest news about Vietnam!

Source: https://tuoitrenews.vn/news/society/20230127/vietnams-da-lat-city-overcrowded-with-vehicles-of-tet-goers/71148.html

Continue Reading

Society

Nha Trang – Saigon railway upgrade project launched

Published

on

A project to upgrade and renovate the railway route that connects Vietnam’s south-central coastal city of Nha Trang and its southern economic hub Ho Chi Minh City kicked off on Thursday, the last day of the seven-day Tet break (2023 Lunar New Year).

The launching ceremony for the project took place at the Thap Cham railway station in south-central Ninh Thuan Province with the attendance of Prime Minister Pham Minh Chinh and many other high-ranking central and local officials, the Vietnam News Agency reported.

The Nha Trang – Saigon railway route is 411 kilometers long, starting from Nha Trang in Khanh Hoa Province and ending in Ho Chi Minh City after running through Ninh Thuan, Binh Thuan, Dong Nai, and Binh Duong Provinces.

The project, expected to be complete in 2025, is estimated to cost VND1,099 billion (US$46.7 million) from the medium-term budget capital source for 2021-25, according to the project management board.

It is aimed at improving the quality and size of the railway infrastructure, thereby increasing transport capacity, enhancing traffic safety, and facilitating the transport of passengers and cargo on the route that links six localities. 

Prime Minister Pham Minh Chinh (L) is seen shaking hands with railway engineers and workers at the Thap Cham railway station in Ninh Thuan Province, south-central Vietnam on January 26, 2023. Photo: Vietnam News Agency

Prime Minister Pham Minh Chinh (L) is seen shaking hands with railway engineers and workers at the Thap Cham railway station in Ninh Thuan Province, south-central Vietnam on January 26, 2023. Photo: Vietnam News Agency

Under the project, all weak bridges on the route will be repaired and upgraded, the railway infrastructure will be renovated and modernized, and some terminals of passenger and goods will be reformed or consolidated, among other components including new constructions.

Addressing the ceremony, PM Chinh asked the Ministry of Transport to direct all the contractors, consultants, and supervisors to mobilize all possible resources and take necessary steps to ensure the project will be implemented efficiently, safely, and on schedule.

In addition, the project must comply with requirements on environmental protection during its implementation, the government leader said.

He asked all the ministries, agencies, and local authorities involved in the project to cooperate with each other effectively to make it a success.

Investment in public transport infrastructure in general and railway systems in particular is not only the duty of the transport ministry, but also the leading political task of local authorities of all related provinces and cities, the PM emphasized.

Like us on Facebook or follow us on Twitter to get the latest news about Vietnam!

A project to upgrade and renovate the railway route that connects Vietnam’s south-central coastal city of Nha Trang and its southern economic hub Ho Chi Minh City kicked off on Thursday, the last day of the seven-day Tet break (2023 Lunar New Year).

The launching ceremony for the project took place at the Thap Cham railway station in south-central Ninh Thuan Province with the attendance of Prime Minister Pham Minh Chinh and many other high-ranking central and local officials, the Vietnam News Agency reported.

The Nha Trang – Saigon railway route is 411 kilometers long, starting from Nha Trang in Khanh Hoa Province and ending in Ho Chi Minh City after running through Ninh Thuan, Binh Thuan, Dong Nai, and Binh Duong Provinces.

The project, expected to be complete in 2025, is estimated to cost VND1,099 billion (US$46.7 million) from the medium-term budget capital source for 2021-25, according to the project management board.

It is aimed at improving the quality and size of the railway infrastructure, thereby increasing transport capacity, enhancing traffic safety, and facilitating the transport of passengers and cargo on the route that links six localities. 

Prime Minister Pham Minh Chinh (L) is seen shaking hands with railway engineers and workers at the Thap Cham railway station in Ninh Thuan Province, south-central Vietnam on January 26, 2023. Photo: Vietnam News Agency

Prime Minister Pham Minh Chinh (L) is seen shaking hands with railway engineers and workers at the Thap Cham railway station in Ninh Thuan Province, south-central Vietnam on January 26, 2023. Photo: Vietnam News Agency

Under the project, all weak bridges on the route will be repaired and upgraded, the railway infrastructure will be renovated and modernized, and some terminals of passenger and goods will be reformed or consolidated, among other components including new constructions.

Addressing the ceremony, PM Chinh asked the Ministry of Transport to direct all the contractors, consultants, and supervisors to mobilize all possible resources and take necessary steps to ensure the project will be implemented efficiently, safely, and on schedule.

In addition, the project must comply with requirements on environmental protection during its implementation, the government leader said.

He asked all the ministries, agencies, and local authorities involved in the project to cooperate with each other effectively to make it a success.

Investment in public transport infrastructure in general and railway systems in particular is not only the duty of the transport ministry, but also the leading political task of local authorities of all related provinces and cities, the PM emphasized.

Like us on Facebook or follow us on Twitter to get the latest news about Vietnam!

Source: https://tuoitrenews.vn/news/society/20230127/nha-trang-saigon-railway-upgrade-project-launched/71145.html

Continue Reading

Society

152 traffic accidents kill 89 throughout Vietnam during Tet

Published

on

Eighty-nine people were killed and 111 others were injured in 152 crashes across Vietnam during the seven-day 2023 Tet (Lunar New Year) holiday starting January 20, the National Traffic Safety Committee reported on Thursday, citing the Ministry of Public Security.

Compared to the same period of last year’s Tet, the numbers of crashes and fatalities declined by 12 and three, respectively, while the injuries rose by eight.

Among the total traffic accidents, 147 cases happened on roads, four occurred on rails, and one in waterway traffic. 

Nineteen accidents occurred on Thursday, the last day of the Tet break and the fifth day of the Lunar New Year, killing 12 people and injuring 15 others.

During the week-long holiday, traffic police officers handled 21,990 cases of road traffic violations, imposed fines totaling some VND50.4 billion (US$2.15 million) on the violators, impounded 639 cars, 9,910 motorbikes and 50 other vehicles, and revoked 4,950 driver’s licenses.

Among the traffic violators were 7,726 drivers under the influence of alcohol, 2,211 overspeeding, and 17 abusing drugs.

Medical facilities across the country received 26,411 cases requiring medical examination and mergency treatment due to traffic accidents from 7:00 am on January 20 to 7:00 am on Thursday.

This figure does not exclude duplicate data in cases of one person visiting multiple hospitals, according to the National Traffic Safety Committee.

The traffic safety agency said that the waves of people coming back to big cities such as Hanoi and Ho Chi Minh City for work after Tet increased remarkably on Thursday.

However, there was no serious traffic congestion at gateways to the metropolitan areas but some local traffic jams such as bottlenecks on the Hanoi-Hai Phong and Phap Van-Cau Gie Expressways in Hanoi and the gridlock on the Rach Mieu Bridge, which lies along a major route connecting Ho Chi Minh City and provinces in Vietnam’s Mekong Delta.

Like us on Facebook or follow us on Twitter to get the latest news about Vietnam!

Eighty-nine people were killed and 111 others were injured in 152 crashes across Vietnam during the seven-day 2023 Tet (Lunar New Year) holiday starting January 20, the National Traffic Safety Committee reported on Thursday, citing the Ministry of Public Security.

Compared to the same period of last year’s Tet, the numbers of crashes and fatalities declined by 12 and three, respectively, while the injuries rose by eight.

Among the total traffic accidents, 147 cases happened on roads, four occurred on rails, and one in waterway traffic. 

Nineteen accidents occurred on Thursday, the last day of the Tet break and the fifth day of the Lunar New Year, killing 12 people and injuring 15 others.

During the week-long holiday, traffic police officers handled 21,990 cases of road traffic violations, imposed fines totaling some VND50.4 billion (US$2.15 million) on the violators, impounded 639 cars, 9,910 motorbikes and 50 other vehicles, and revoked 4,950 driver’s licenses.

Among the traffic violators were 7,726 drivers under the influence of alcohol, 2,211 overspeeding, and 17 abusing drugs.

Medical facilities across the country received 26,411 cases requiring medical examination and mergency treatment due to traffic accidents from 7:00 am on January 20 to 7:00 am on Thursday.

This figure does not exclude duplicate data in cases of one person visiting multiple hospitals, according to the National Traffic Safety Committee.

The traffic safety agency said that the waves of people coming back to big cities such as Hanoi and Ho Chi Minh City for work after Tet increased remarkably on Thursday.

However, there was no serious traffic congestion at gateways to the metropolitan areas but some local traffic jams such as bottlenecks on the Hanoi-Hai Phong and Phap Van-Cau Gie Expressways in Hanoi and the gridlock on the Rach Mieu Bridge, which lies along a major route connecting Ho Chi Minh City and provinces in Vietnam’s Mekong Delta.

Like us on Facebook or follow us on Twitter to get the latest news about Vietnam!

Source: https://tuoitrenews.vn/news/society/20230127/152-traffic-accidents-kill-89-throughout-vietnam-during-tet/71144.html

Continue Reading

Trending